Friday, September 26, 2008

Very tough job?

House is under renovation for 3 months full. When the renovation is undergoing on full time basis, I don't understand why it took so long too. Given that it takes long to deliver the work, the workdone is supposed to be satisfactory right? In fact, IT WAS NOT!

One of the unsatisfactory is this stainless steel door. Everything was fine until the door was installed, and the tiles were patched up. Is the door properly installed? The door INCLINED OUTWARDS, slightly run.

The second thing, a very exaggerating mistake! See the floor tiles and one can easily tell what was wrong. The toilet was OUT OF SHAPE by 2 inches!!! Is he blind??

Then is the painting work.

Veerla says (9:02 AM):
hahaha
Veerla says (9:02 AM):
ugly leh ur room
Terence says (9:03 AM):
they painted the wrong wall
Terence says (9:03 AM):
funny hor
Terence says (9:16 AM):
油漆佬也是亂來的
Terence says (9:17 AM):
那個豬肝紅是油外面的牆
Terence says (9:17 AM):
他油我房間
Terence says (9:17 AM):
還油錯牆壁
Terence says (9:17 AM):
爸爸要和他講油冷氣對面
Terence says (9:17 AM):
他油窗口
Terence says (9:18 AM):
雞蛋不雞蛋

2 comments:

Yiqi said...

so blur punya contractor! 扣钱!

Anonymous said...

有没有发现到你blog里面写的都是一些对生活,社会,周遭环境的不满和埋怨,大多数都是负面是事情,问题出在哪里??

你对生活的态度